Prev: Jul 2007
back
Next: Sep 2007
August 2 - Sewing room beams are being installed on the ceiling. The beams are also western red cedar.
August 9 - The baseboard is installed on the back hallway. The laundry room is on the right. The distant door is the sewing room.
August 9 - The entertainment center is installed beside the fireplace. The fireplace is covered with plastic for protection.
August 10 - Granite counter tops have arrived and are being installed. The sink openings have been partially cut out, but not removed.
August 10 - Five men carry the granite tops into the house. It has a clamp on brace to hold it securely until it is in place.
August 13 - The back hall has imported stone. It connects the sewing, laundry, a powder room and main hallway.
August 13 - The kitchen counter tops and sinks are installed. The blue box in the foreground is for an electrical outlet.
August 13 - This view shows the relationship of the kitchen counters with the fireplace and family room.
August 13 - The dining room has cove lighting behind the crown molding.
August 16 - The stairway has a large column at the inside of the turn. It is being fabricated in our cabinet shop.
August 16 - The screen has been installed on the back porch.
August 22 - The main hallway floor is being installed. This tile is laid on a steel mesh.
August 22 - A walnut border is being installed in the breakfast nook.
August 23 - Tile in the hallway is nearly complete. The same tile goes in the entrance foyer. The blue tape is masking to keep glue off the wood.
August 23 - The tile is laid in various patterns in each square. Wood surrounds the tile squares.
August 24 - The breakfast nook has a walnut outline and spokes in the flooring. The wood is precisely cut. It will be filled with oak.
August 24 - This is a close up of the center circle and three spokes. Note how precisely the wood is cut. Who needs filler?
August 28 - Oak has been installed between two spokes. The paper at the top protects the floor as the wall trim is painted.
August 28 - The sewer holding tank is being installed. The light colored control box is visible on the wall.
August 28 - The tank has a grinder and pump. It is about five feet tall.
August 1 - Beams are installed in the billiard room upstairs. The sewing room also gets beams. They are being installed today.
August 1 - The billiard room beams are finished and look good.
August 3 - The beams are installed in the sewing room. There is still a scaffold in the room that will be removed soon.
August 8 - The study pocket doors have been installed. The left door is closed. They have beveled glass panels.
August 8 - The master suite is trimmed out. Only a few days more and the interior trim will be finished.