Home
About Us
Services
Testimonials
FAQ
Projects
News
Learning
Contact Us
Employment
Home
About Us
Services
Testimonials
FAQ
Projects
News
Learning
Contact Us
Employment
Prev: Nov 2007
back
Next: Jan 2008
December 4 - The window seat in the mud room needs to be finished.
December 4 - The garage railings are installed on the second floor. They are the same style as in the house.
December 10 - The fireplace brick has been laid. The hearth is also brick. (The right part of the hearth is still covered with cardboard in the photo.) A mantle will be added soon.
December 11 - The yard has been filled. Notice the dirt is much higher by the breezeway. The driveway will be built before long.
December 12 - The yard has been filled to insure water will run off around the house. Landscaping has not been done yet. The early morning haze can be seen in the photo.
December 13 - The entertainment cabinet has been installed in the Brays Room. It has adjustable shelves and was custom built by Ponds & Sons.
December 13 - A small seat was built in the master bathroom. It has two drawers in it.
December 31 - This garage door has been painted its final color. The windows on the door have masking on them.
December 31 - Handrails for the front stairway are finished. The Brays room ceiling is visible over the railing at the top of the stairs.
December 31 - The Brays room now has fans and chandeliers. Only one of each is visible in this photo.
December 31 - Light fixtures have been hung in the front hallway.
December 31 - This is the view of the front stairs from the study doorway. They have not been finished yet.