December 4 - The garage railings are installed on the second floor. They are the same style as in the house.

December 10 - The fireplace brick has been laid. The hearth is also brick. (The right part of the hearth is still covered with cardboard in the photo.) A mantle will be added soon.

December 11 - The yard has been filled. Notice the dirt is much higher by the breezeway. The driveway will be built before long.

December 12 - The yard has been filled to insure water will run off around the house. Landscaping has not been done yet. The early morning haze can be seen in the photo.

December 13 - The entertainment cabinet has been installed in the Brays Room. It has adjustable shelves and was custom built by Ponds & Sons.

December 31 - This garage door has been painted its final color. The windows on the door have masking on them.