Prev: Nov 2006
back
Next: Jan 2007
December 4 - The front of the house with most of the windows installed.
December 4 - The chimney flue and flue liner are installed.
December 5 - A beautiful elliptical window.
December 5 - Arched windows overlooking the driveway.
December 6 - Windows are installed. The ground is still wet.
December 6 - Doors going on to the rear porch are installed.
December 8 - Electrical rough in well under way.
December 14 - The side stoop has decking and steel and is ready for concrete.
December 14 - Bricks have been delivered for the chimney.
December 14 - Fill dirt is put in place for the spa deck.
December 15 - The footer and steel are ready for concrete for north service yard.
December 15 - The footer and steel are ready for concrete for south service yard also.
December 18 - Framing to support the garden tub is completed in the master bathroom.
December 18 - Rough in wiring is proceeding nicely.
December 20 - Exterior trim has started.
December 21 - The pad for a spa has been filled and formed.
December 21 - Exterior trim really sets off the elliptical window. Compare this to the Dec. 4 photo which has no exterior trim.
December 21 - The windows are beautiful with the exterior trim added. Compare this to the window without exterior trim on Dec. 5.