December 4 - Brick pavers are being laid in the drive though area in a herring bone pattern. they will be grouted in a day or two.
December 5 - The breezeway brick has been laid. It is being grouted today. Soon brick will be laid in front of the garage doors to the side stairway.
December 5 - The ground is being prepared for a concrete parking pad. Bricks from the breezeway will extend to the brick steps just to the right of the garage door.
December 7 - The brick work is finished...for now. Soon the parking area will be paved and brick borders will be laid around it. The circle drive in the front will also have a brick border.
December 10 - The parking area near the single car garage is formed and ready to pour. It will have a brick border around it. The drive through is on the right edge of the photo.
December 11 - The circle drive is being formed for concrete. It will also have brick work on it.
December 12 - The first half of the rear parking area is being poured today. Tomorrow the remainder (on the left in the photo) will be poured.
December 13 - Forms are up to pour a sidewalk from the front door to the circle driveway. It is planned to be poured tomorrow.
December 13 - Forms are also up to pour a short drive from the garage drive through to the circle driveway. This will also be poured tomorrow.
December 13 - The second half of the rear parking area is being poured today. The rear parking area will have a brick border.
December 13 - The brick border on the first half which was poured yesterday is in place. It will be grouted soon.
December 14 - A brick border has been laid around the entire rear parking area.
December 14 - This is the view from the garage drive through. The circle will be poured in the next day or two.
December 14 - The circle center foundation is being dug. It will have a walk and flag pole.
December 17 - The brick sidewalk is being laid. A planter will be at the foot of the steps on either side. The walk will be grouted tomorrow.
December 17 - The foundation for brickwork in the center was poured last Friday.
December 18 - It got cold last night here in coastal South Carolina. The fields and roofs are covered with frost.
December 18 - The brick walk way is complete. The two areas off the walks are for planters. The bricks will be grouted soon.
December 18 - Half of the circle drive has been poured. A row of brick will be laid in the gap that is formed.
December 19 - The circular driveway has been poured. It has a brick border inside and out. A flag pole will be installed in the center.
December 19 - The driveway was built this afternoon. It will have landscaping planted around it.
December 19 - The brick border from the drive to the garage joins the border of the circle here. The brick to the right goes to the inside of the circle.
December 31 - The center of the driveway is nearly finished. The enclosed areas are flower boxes. The stack of bricks is on what will be the walkway.