August 8 - The plumbing rough in is complete. The short pipes will attach to fixtures on this floor or go up to the next floor. The tall pipe holds water to make sure the joints are all leak proof. Monday, the electricians will install three floor outlets and a long conduit under the slab in case power is needed on the right side of the house.