Padron Residence: September 2022
Prev: Aug 2022
back
Next: Oct 2022
07 September 2022 - The ceiling looks amazing.
07 September 2022 - Steel roofing is on site.
07 September 2022 - The garage walls are being framed.
07 September 2022 - Trim parts for the roof are also on site.
20 September 2022 - The Guest House exterior has been painted.
20 September 2022 - The roof and exterior walls of the main house are being prepared for their coverings.
20 September 2022 - Front steps are complete on the Guest House.
20 September 2022 - The Garage roof is being prepared for the roofing. Sheathing is started on the walls of the garage.
20 September 2022 - The roof of the main house is closed and weather tight. The final roofing has not been installed yet.
20 September 2022 - The Great Room has a see through (2 sided) fireplace. The Isokern prefab modules are in place and will be covered.
20 September 2022 - IPE decking boards are on site. They will be used for the porch decking.
28 September 2022 - More of the exterior has been primed. The slab is for a service yard.
28 September 2022 - Wall sheathing is going up. This large room has a fireplace.
28 September 2022 - The main house roof is covered and dried in. The house is wrapped. The front porch is framed.
28 September 2022 - Inside work is continuing. Notice the large wood beams and the steel column.
28 September 2022 - The interior is protected from the elements.
28 September 2022 - The owner’s porch is being covered with tongue and groove IPE.