July - A two car garage will be built here. It will have a covered walkway connecting it to the existing structures.
July 17 - Batter boards and string are up. The garage is laid out and ready to dig.
July 18 - The footers have been dug.
July 19 - Dirt is pulled back from the footers. Steel rebar is installed per the structural prints.
July 19 - About 75 cubic yards of dirt were removed from the berm for the garage. More will have to be removed when it is time to prep for the slab.
July 20 - The footers are poured for the block walls.
July 20 - This view is from the front of the garage. Much of the dirt has been removed and the footers have been poured.
July 25 - The blocks are laid. Steel has been placed in them. A core inspection is scheduled for Monday, July 29.
July - The shrubs have been cleared and trees trimmed to prepare for excavation.