Burris Residence: September 2022
Prev: Aug 2022
back
Next: Oct 2022
07 September 2022 - The house is being cleaned. Masking paper and tape has been removed. The floor looks amazing.
07 September 2022 - The pantry is ready to stock.
07 September 2022 - Without the masking paper, the kitchen has come to life.
07 September 2022 - The treat room floor looks very good.
07 September 2022 - The brick entry is very welcoming.
07 September 2022 - Closet built ins are finished. Clothes rods are in place.
07 September 2022 - The master bath floor, cabinets and counter tops are installed. Masking paper and tape is down.
07 September 2022 - The master closet built ins are finished. Adjustable shelves have not been positioned yet in the island.
07 September 2022 - The laundry room floor is finished. There are a number of shelves for storage and a sink.
07 September 2022 - The distressed white floor in the breakfast area makes the room light and airy.
20 September 2022 - The yard is being prepared for sod. The Certificate of Occupancy inspection passed last week.
20 September 2022 - Electricians are installing the whole house generator.
20 September 2022 - Sod is being unloaded from the flatbed trailer to be placed in the yard.
28 September 2022 - The driveway base and edging is in. Landscaping is in progress.
28 September 2022 - The garage apron has been poured. Unfortunately, it is not done well, so it will be redone.
28 September 2022 - The front step tabby concrete has been poured. It will be rinsed soon so the shells are exposed.