Home
About Us
Services
Testimonials
FAQ
Projects
News
Learning
Contact Us
Employment
Home
About Us
Services
Testimonials
FAQ
Projects
News
Learning
Contact Us
Employment
Prev: Oct 2007
back
Next: Dec 2007
November 7 - The deck railing has been painted. A walkway will be built between the storage room and the walk to the cottage.
November 7 - The view out the double doors over the deck is very nice. The right door is not open.
November 7 - This is the lake view of the garage. The right door goes upstairs to the apartment. The left door goes to the garage.
November 16 - The garage is enhanced by the new landscaping. There is a turn around on the left. The driveway will be filled with gravel.
November 16 - Now there is a brick walk from the storage room to the connecting sidewalk. There is a cast iron boot rack on the storage room porch.
November 16 - This is the garage as viewed from the front porch.
November 29 - A nice curved brick walkway has been built from the storage room to the driveway.
November 30 - The stairs have been painted and stained. They also have a sealer coat on them. The handrails still have blue masking tape on them.
November 30 - There is a wood floor at the foot of the stairs inside. Outside, there is a brick stoop and walk leading to the cottage.