Lightcap Residence: February 2023
Prev: Jan 2023
back
Next: Mar 2023
07 February 2023 - Work continues on the framing. Some carpenters are working on the front porch although it is difficult to see in this photo.
07 February 2023 - The auto bay doors have been cut in the house wrap. The upstairs windows are not opened yet.
07 February 2023 - The garage auto bays are full of windows and exterior doors waiting to be installed.
07 February 2023 - Most of the interior framing is done.
07 February 2023 - This is the porch overlooking the water. It is rounded at the far end.
07 February 2023 - Floor joists are being installed for the front porch. The steel columns to support the second floor are visible.
07 February 2023 - From the second floor, the view is quite dramatic.
07 February 2023 - The stairs have been roughed in. There are two landings.
07 February 2023 - The structural steel is visible in some places at the moment.
14 February 2023 - The second floor porch deck is framed (but not covered yet. It is supported by a large beam held up by the steel columns.
14 February 2023 - Columns are in place for the side porch of the garage and apartment.
14 February 2023 - The water side of the house framing is being finished. The porch now had a subfloor.
14 February 2023 - A carpenter is finishing the floor of the room facing the water.
14 February 2023 - The upstairs porch joists are in place.
20 February 2023 - Framing is continuing. The front porch rafters are being installed.
20 February 2023 - More interior framing has been done.
20 February 2023 - The room overlooking the water is floored and being framed.