Home
About Us
Services
Testimonials
FAQ
Projects
News
Learning
Contact Us
Employment
Home
About Us
Services
Testimonials
FAQ
Projects
News
Learning
Contact Us
Employment
Lightcap Residence: March 2023
Prev: Feb 2023
back
Next: Apr 2023
07 March 2023 - Framing is continuing. The front porch roof is sheathed.
07 March 2023 - The garage deck and stairway are being framed.
07 March 2023 - The steel framing is visible on the chimneys.
07 March 2023 - The right-rear corner of the house is currently being framed.
07 March 2023 - The front porch has not been decked yet, but is covered by roof.
07 March 2023 - The carriage house carport and side porch are being framed.
14 March 2023 - The porch floor framing is complete. Plywood has been temporarily placed on the joists.
14 March 2023 - The Dining Room that overlooks the water is being framed. The round wall contains series of large windows.
14 March 2023 - Steel tie down rods are being installed. They tie the top plate of the house to the foundation.
14 March 2023 - This is the base of the elevator shaft on the first floor.
14 March 2023 - The elevator cage goes into this shaft. The opening to the second floor has been covered temporarily.
14 March 2023 - This is where the elevator stops on the second floor.
14 March 2023 - This is a view of the second floor foyer balcony.
21 March 2023 - The carport is being framed on the north side of the garage.
21 March 2023 - On the south side of the garage the second floor porch is being built.
21 March 2023 - The "round" dining room walls are sheathed.
21 March 2023 - The front porch ceiling and roof framing are complete. Notice the gap next to the house for the bricks.
21 March 2023 - The stacks of lumber in the front yard are just about used up as framing nears completion.
28 March 2023 - The shed roof on the north side of the carriage is framed and sheathed.
28 March 2023 - Framing is continuing on the south side of the garage. The second story deck is framed and framing is beginning on the roof.
28 March 2023 - Rafters are in place over the "circular" dining room that overlooks the water.
28 March 2023 - This is the water side (rear) of the home. Dining room rafters are visible as are columns to the left of the dining room.
28 March 2023 - The front porch has cut out areas in the floor decking for decorative brick columns.