June 5 - Here are the sidewalks before the forms are removed and brick borders are added.
June 5 - Concrete is being poured for the front sidewalks. Oyster shells seen in the wheelbarrow will be embedded in the concrete.
June 5 - The sidewalks are poured and the slurry has been washed away in this section exposing the embedded oyster shell.
June 5 - Once the concrete sets up enough the slurry is washed off of the top exposing the oyster shell underneath.
June 5 - The black lid is the top of the propane gas tank which was installed today.
June 5 - Railing is coming along nicely on the back porch.
June 5 - The view of the front sidewalk from the breezeway. Brick borders will be added along the edges soon.
June 5 - The wood floors look great after their final coat of finish.