Padron Residence: December 2022
Prev: Nov 2022
back
Next: Jan 2023
06 December 2022 - Carpenters are working on the front porch ceiling. If you look closely, you’ll see him on the right end of the scaffold.
06 December 2022 - Rough in electrical continues.
06 December 2022 - The beams are tied together securely with custom steel brackets.
06 December 2022 - Stone on the great room chimney is finished. I took this looking up towards the roof.
06 December 2022 - The pass through firebox in the great room has fire brick laid in it.
06 December 2022 - HVAC (air conditioning) ducts are being roughed in.
06 December 2022 - The porch fire brick is being laid. The mason did not want to be in the photo.
06 December 2022 - Wood framing forms where the stone is laid on the back of the porch fireplace.
06 December 2022 - The entertainment room in the stable has doors installed.
06 December 2022 - Windows have been installed in the stable.
06 December 2022 - HVAC rough in work is being done in the stable as well as the main house.
12 December 2022 - The great room fireplace and chimney masonry is finished.
12 December 2022 - Firebricks have been laid in the porch fireplace. The stone is finished on this fireplace.
12 December 2022 - The large room in the old stable will be a very nice room.
20 December 2022 - Some of the interior doors have been hung.
20 December 2022 - reclaimed lumber has been delivered and is being cut to width.
20 December 2022 - There is a significant amount of flooring on site.
20 December 2022 - HVAC ducting is being installed.
20 December 2022 - The flooring is in the north bath. It is acclimating to the house.