Padron Residence: May 2023
Prev: Apr 2023
back
Next: Jun 2023
02 May 2023 - The front porch is being prepared for paint. Notice the white caulking.
02 May 2023 - The floor has been sanded throughout the main house.
02 May 2023 - Once the floors are finished then the interior painting will begin.
02 May 2023 - The reclaimed floor has been sanded and is ready for staining.
02 May 2023 - These reclaimed screened doors are hung and ready for refinishing.
02 May 2023 - The ceiling and beams in the billiards room are trimmed out.
02 May 2023 - The tile mason is getting set up to lay tile in the “stable.” This is his tile saw.
09 May 2023 - Painting is complete on the front porch ceiling.
09 May 2023 - The kitchen cabinets and floor will be covered next before painting starts. The Durock walls will be tiled.
09 May 2023 - The floors are finished and will be covered soon in preparation for painting.
09 May 2023 - The main house porch roof is being painted. The beams are wrapped in plastic and will be stained later.
09 May 2023 - The bunk room shower is being tiled.
09 May 2023 - The billiard room trim is nearly complete.
09 May 2023 - Painting is nearly complete on the front of the main house.
16 May 2023 - The VIP Suite shower is being tiled. The green spacers insure the tiles are spaced evenly.
16 May 2023 - The apartment bath shower is complete and looks great!
16 May 2023 - The bunk room bath shower is nearly complete!
16 May 2023 - A worker is cutting off excess lengths of bolts in the peak of the porch ceiling.
16 May 2023 - The grill cabinets are built and ready for paint and countertops.
16 May 2023 - The back kitchen is masked and caulking is done before painting.
16 May 2023 - A painter is at the top of the ladder caulking in preparation for painting.
16 May 2023 - These walls will be painted soon along with the window trim.
16 May 2023 - The master morning bar cabinets are wrapped ahead of painting.
16 May 2023 - The master bath is all wrapped in preparation for painting.
16 May 2023 - The painters have started by covering the floors. Caulk, putty and priming are next.