02 May 2023 - Drywall has been hung and is being finished. The purple dry wall is water resistant which is required where pipes penetrate the drywall.
02 May 2023 - This is the great room. The interior of the home is taking shape!
09 May 2023 - Sheetrock has been hung and finished. The final sanding is underway.
09 May 2023 - The master bedroom has a vaulted ceiling. The doors in the background open to a porch overlooking the pool.
09 May 2023 - Electrical outlets are being wired for inclusion in the baseboards. The floor is dusty from sanding the drywall.
09 May 2023 - The guest house exterior is nearly complete. Carpenters are currently trimming out the inside.
09 May 2023 - The guest wing (to the right of the breezeway) exterior is being finished. Some landscaping has been installed.
09 May 2023 - Cabinets are being installed in the guest cottage. Interior trim is in progress.
09 May 2023 - The guest cottage shower is being prepped for tile. The floor tile will be laid on the orange Ditra decoupling membrane.
09 May 2023 - This window is all trimmed out inside the guest house.
09 May 2023 - View from the head of the driveway. The workshop is on the left, the main house is in the center and the guest cottage is on the right at the edge of the photo.
07 May 2023 - The windows of the main house are covered while the exterior is painted.
07 May 2023 - The walkway to the guest house is formed. It will be tabby concrete with a brick border.
07 May 2023 - A walkway is formed from the breezeway to the circle drive. It will have a brick border like the other walkways.
07 May 2023 - The walk to the front door is wide. The front steps are being bricked.
07 May 2023 - The pool apron is formed for tabby concrete.
07 May 2023 - These steps are off the screened porch and patio and are round.
07 May 2023 - The master porch has steps down to the pool deck.