13 Indigo Trail N Residence: May 2015
Prev: Apr 2015
back
Next: Jun 2015
May 2 - Interior wall and ceiling painting is coming along nicely.
May 2 - Interior doors are now installed. Next is the stained casing.
May 2 - The sun room trim is complete and ready for paint.
May 2 - The sun room looks a bit like an old porch that was closed in.
May 4 - The stained trim has arrived. First up are the beams in the great room.
May 4 - This beam goes front to back in the highest part of the ceiling. It is being partially assembled on the floor.
May 4 - The first piece of beam material is in place.
May 4 - The first beam is complete.
May 6 - Concrete is being poured in the driveway.
May 6 - The first part of the driveway has been poured. The rest will be poured another day.
May 6 - The beam work is coming along quite nicely.
May 6 - The long beams have been installed so now the shorter beams go in.
May 6 - The back patio is freshly poured. All of the sunken areas will get filled with brick later.
May 6 - The interior doors and wood windows have been painted now.
May 6 - The dog kennel and generator pad were poured today.
May 7 - The last bit of concrete for the driveway is being poured now.
May 8 - The beam work in the high ceiling is done now.
May 8 - The beams really set off the room!
May 12 - Here the beams are finished in the great room and kitchen.
May 12 - The beam work extends into the dining alcove as well. The LED can lights look really nice too!
May 12 - The sun porch trim has been painted. It's going to look great when it's finished!
May 27 - The masons have started laying the borders around the driveway. The brick really dresses it up.
May 29 - Cabinetry has arrived and is laid out according to room.
May 29 - The laundry cabinets are going in.
May 29 - The left cabinet is where the sink goes and it is extra deep so as to be flush with the washer and dryer stack.
May 29 - Most of the bricks are laid around the driveway now and have been grouted in with mortar.