December 4 - Landscaping has begun. Irrigation lines are being installed.
December 4 - A small access hole has been built into the area over the porch ceiling. It will have an insulated door. The rafters will also have spray in foam insulation.
December 5 - The HVAC air handlers are installed in the attic. This unit is for downstairs. It has both electrostatic and UV filters for clean air.
December 6 - The doors and windows are being installed today. The house is also being covered with house wrap.
December 6 - Electrical rough in is continuing today. It should be finished in the next few days.
December 10 - Most of the windows have been installed. The Carolina room has three large windows in addition to another 12' section of windows and doors on the east side.
December 12 - The garage dormers are being trimmed. The fascia still has to be installed.
December 13 - The exterior trim has begun on the west side of the garage.
December 13 - The garage dormers are trimmed. They are very nice with the exposed rafter tails and detailed trim.
December 13 - The front door has trim installed around it also.
December 17 - The garage exterior trim is getting finished. Roof flashing will be installed in a day or two.
December 31 - The siding has begun on the garage. It is cement board siding.
December 31 - Campbell's house has a great deal of exterior trim as you can see here.
December 31 - The trim detail shows up well on the north side of the house as can be seen here.
December 31 - Copper flashing is installed above the drip rail. Concrete siding board will be installed above the flashing.