January 8 - Exterior trim is nearly complete. Siding is being installed on the dormers.
January 8 - The rear porch is nearly complete with columns, beams, and v-groove ceiling.
January 8 - Brick is being laid around the Isokern chimneys.
January 8 - Copper is covering the drip cap around the majority of the house and garage.
January 8 - Step flashing has been installed on the roof . Shingles will start being installed within a day or two.
January 8 - Cypress v-groove ceiling boards are installed on the front porch.
January 8 - Cypress v-groove ceiling boards have been completed on the rear porch.
January 8 - Electrical rough-in has been completed.
January 8 - A chase was built to conceal the return air ducting in the laundry room.
January 10 - Roofers now have bundles of shingles on the roof and have started work on rear gables.
January 10 - Roofers are busy at work.
January 10 - The shingles are going on quickly. This is the valley above the master bedroom.
January 10 - Things are moving along nicely. This is the the valley above the great room.
January 10 - Roofers are now working on the gable above the screened porch.
January 10 - Shingles are being installed on the gable above the master bedroom.
January 11 - Masons continue with the construction of the chimney.
January 11 - Fiber-cement siding is now being installed on the exterior of the laundry room wall.
January 15 - The roofers have almost finished the front portion of the roof.
January 15 - Siding is being installed around the master bedroom and bathroom.
January 15 - The brick chimney is close to completion.
January 16 - The front roof will be finished in a matter of hours.
January 16 - Siding is being installed on the front porch.
January 16 - The chimney is now complete. Note the special shape of the brick chimney cap.
January 16 - The chimney as seen from a distance.
January 18 - Distressed oak flooring has been installed in the master bedroom.
January 18 - The oak flooring has now been installed in both master closets and the hallway.
January 18 - A closer look at the flooring in the master closets and hallway.
January 18 - The interior fireplace has been prepared for the brick facing.
January 18 - The beams on the front porch are finished.
January 18 - Siding is now complete on the front of the house.
January 18 - Distressed oak is being installed in the great room.
January 22 - The interior brick fireplace has just been completed.
January 22 - Insulation has been installed in the master bath.
January 22 - Fiberglass insulation is being installed in the laundry room.
January 22 - The area around the fireplace is being cleaned.
January 22 - Fiberglass is now finished in the garage.
January 22 - This is the guest bedroom above the garage.
January 22 - Siding has been finished near the service yard.
January 22 - Masons have started work on the exterior fireplace.
January 22 - The front portion of the garage now has shingles.
January 24 - The chimney receives a few finishing touches.
January 24 - The chimney is now finished.
January 24 - Flooring has just been installed in the garage.
January 24 - This is the oak flooring in the kitchen and dining room above the garage.
January 24 - The shingles are now finished on the garage making the roof complete.
January 29 - Sheetrock is going up on the second floor. This is the exercise room and north bedroom.
January 29 - A look down the hallway of the north bedroom.
January 29 - View of the east bathroom.
January 29 - Ceiling of the east bathroom.
January 29 - Protective paper has been put down on top of all the hardwood flooring.
January 29 - This is a view of the great room after the floor protection had been installed.
January 29 - Front view of the house. The painters are working on the trim.