Prev: Jan 2008
back
Next: Mar 2008
February 7 - These are 1x8 pine boards. They will soon be installed on select walls.
February 7 - The sheetrock will be finished within a couple of days.
February 7 - Tile is being installed in the master bathroom.
February 7 - Wall boards are now being installed.
February 7 - Wall boards in the kitchen.
February 8 - Tile is going up quickly in the master shower.
LCampbell080208a
February 8 - Pebbles are now installed in the master shower.
February 8 - A close up of the pebbles.
February 8 - The master bathroom floor is also getting tile.
February 11 - The wall boards are now complete in the kitchen area.
February 11 - This is the finished tile in the west bathroom.
February 11 - Tile is now being laid on the ceiling in the master shower.
February 11 - Tile has been installed completely in the master bathroom now.
February 11 - The ceiling of the master shower.
February 11 - A view of the master shower after the tile is done.
February 11 - The tile is also finished in the east bathroom.
February 18 - Pine wall covering is now finished in the great room.
February 18 - Pine ceiling boards are done in the kitchen.
February 18 - This is the great room. The pine walls and ceiling are now finished.
February 18 - This is a view of the kitchen from the great room.
February 19 - The cabinets have just been delivered.
February 19 - Ceiling boards are now installed in the study and foyer areas.
February 22 - A frontal view of the house.
February 22 - This is a side view of the garage after the final exterior painting.
February 22 - The porch railing is being primed before assembly and installation.
February 22 - The primer coat of paint has been applied.
February 22 - This is where the oven/range will be.
February 22 - The master bath cabinets will be installed soon.
February 22 - These are the cabinets which will be installed in the east bath.
February 22 - The wall and ceiling boards are now done in the study.
February 27 - Crown molding has been installed above the stairs.
February 27 - The master bedroom now has crown molding.
February 27 - The west bathroom is now painted.
February 27 - The wall boards are finished in the stairwell. The wall boards are now complete throughout the house.
February 27 - Crown molding in the entrance area is done.
February 27 - This is the laundry room with crown molding installed.
February 27 - The back porch will soon be screened. It will also have stairs to the ground.