March 3 - The front of the house.
March 3 - This is the base cap around all front porch columns.
March 3 - Cabinets are being installed in the laundry room.
March 3 - These are the cabinets in the master bathroom.
LCampbell080303d
March 3 - The cabinets are done in the east bathroom.
March 3 - Crown molding is now complete throughout the second floor.
March 3 - Cabinets in the west bathroom are installed.
March 3 - The handrails have been started on the front porch.
March 5 - The handrails have been completed on the garage stairway.
March 14 - The land has been sloped and contoured to promote drainage.
March 14 - The rear door now has trim on it.
March 14 - Trim in the master bedroom is done.
March 14 - This is a view from the master bedroom into the master bath.
March 14 - Doors and trim are done in the south bedroom.
March 14 - A view from the south bedroom into the west bath.
March 14 - The front of the house.
March 14 - A side shot showing where the garage sits in respect to the house.
March 14 - This is where the kitchen sink and dishwasher will go.
March 14 - This is the oven/stove area.
March 14 - The island is now built in the kitchen.
March 14 - The trim work in the great room stands out nicely.
March 14 - This is a view from the great room into the kitchen and foyer.
March 14 - The great room with the fireplace in the background.
March 20 - Cement has been poured for the walkways.
March 20 - Masons are working the cement to get it just right.
March 20 - The wheelchair lift stoop is now built and will have handrailing soon.
March 20 - The walkways are done and the brick will go on it soon.
March 20 - The service yard now has concrete.
March 20 - The rear steps have a concrete base poured.
March 20 - This is a view of the rear of the house with steps and cement done.
March 20 - Granite counter tops have just been installed in the guest suite.
March 20 - The master bathroom now has a granite counter top.
March 25 - Paint is being applied to the closet doors in the south bedroom.
March 25 - A granite counter top is complete in the east bathroom.
March 25 - The laundry room has cultured marble as a counter top.