April 2 - The oak flooring has just been sanded smooth. A topcoat will be applied tomorrow.
April 2 - Oak flooring in the master bedroom is now sanded.
April 2 - This is the stairway as viewed from the second floor. Railings will be installed next week.
April 2 - The oak flooring in the study is now ready for a topcoat.
April 2 - A fence is being built under the garage stoop.
April 2 - The wheelchair lift stoop now has fencing around the bottom and a gate at the top.
April 2 - A fence is being built around the service yard.
April 2 - Another view of the service yard.
April 2 - The rear steps are being painted.
April 3 - The stair treads have a fresh coat of polyurethane applied to them.
April 3 - A clear finish is now on the foyer area.
LCampbell080403b
April 3 - Another view of the great room after the floor has been finished.
April 3 - The floors going into the bedroom are done as well.
April 3 - The shutters are being prepared for painting.
April 8 - The garage service yard is now built.
April 8 - This is the gate to the garage service yard.
LCampbell080408b
April 8 - Structure for the screening is now built on the rear porch.
April 8 - This is another view of the screen structure on the rear porch.
April 8 - The kitchen island sink is installed.
April 8 - The main sink in the kitchen is installed.
April 8 - Sinks have been installed in the master bathroom.
April 8 - The west bathroom is now complete with sink and toilet.
April 23 - The stove/oven has been installed now.
April 23 - Steel edging outlines the gravel walkway.
April 23 - The walkway continues around to the rear of the house.
April 23 - A rear view of the Campbell Residence.
April 23 - The stove/oven is installed in the garage apartment.
April 28 - A view from the entry foyer into the kitchen.
April 28 - View from the kitchen to the great room. Notice the walnut trim.
April 28 - The great room.
April 28 - All kitchen appliances are now installed.
April 28 - The view of the great room. Notice the fans and can lights.
April 28 - This is the master bath complete with lights.
April 28 - This is the clawfoot tub in the master bath.
April 28 - The laundry room complete with washer and dryer.