Home
About Us
Services
Testimonials
FAQ
Projects
News
Learning
Contact Us
Employment
Home
About Us
Services
Testimonials
FAQ
Projects
News
Learning
Contact Us
Employment
Prev: May 2007
back
Next: Jul 2007
June 12 - Window casing is installed. Interior doors will be installed and trimmed starting today.
June 13 - The interior doors are hung. Baseboard is being installed.
June 15 - The bedroom ceilings are finished. The wire is for a ceiling fan.
June 15 - The dormers have boards on the side walls to match the ceiling. Soon the top beam will be trimmed and other beams and trim will be added.
June 15 - The guest bedroom also has the ceiling finished. Air conditioning is now on. Flooring will begin in a few days.
June 18 - Back porch screen is being installed on the cottage. On the right edge of the porch, you can see a reflection of the sun on the bronze screen.
June 18 - The front view of Gitlitz Cottage and Garage.
June 20 - The guest bathroom has honeycomb shaped (hexagon) small tile on the floor. You can see the air conditioner vent on the right and toilet connection on the left.
June 20 - The wood flooring is down. It is neatly fitted and trimmed.
June 20 - This a view across the great room from the front door to the back porch door.
June 21 - The bronze screen is clearly visible above the railing. Screen for below the railing will be installed in the next few days.
June 21 - Tile is being installed around the tub in the guest bathroom.
June 21 - Another view of the tile surrounding the guest bathroom The dark spots are spacers and will come out as soon as the cement cures.
June 21 - This is a view of the floor from the kitchen area to the fireplace. The unfinished floor is smooth enough to have a shine from the windows.
June 21 - The guest bath also has a hexagonal tile. It has light gray tiles in the pattern.
June 25 - The master bath tile has a gray accent near the top. The sheet rock above the tile has not been painted yet.
June 28 - The shower and master bath tile looks very nice. The floor of the shower needs to be grouted still.