Prev: Sep 2007
back
Next: Nov 2007
October 5 - The overhead garage door has been installed. It has not been painted yet. The column supporting the upstairs deck is also in place.
October 5 - The deck has been installed over the storage room. Soon the railings will be built.
October 12 - There will be a stoop outside these doors and a side walk leading to the cottage.
October 16 - The garage has a brick stoop leading to a brick sidewalk to the house. The door thresholds will have brick supports under them today.
October 18 - The deck railing is complete except for painting. The white at the bottom is the deck waterproofing from the deck.
October 22 - The railing makes a nice deck over the storage room. It will be painted green to match the house trim.
October 22 - The bathroom floor has been tiled. It matches the tile in the house bathrooms. In the next day or so, the walls will be tiled.
October 22 - The windows have plantation shutters mounted over the lower sash. The shutters open and close and even open like doors. Notice the hinges.
October 22 - The walk connects the house and cottage. Notice the very nice brickwork at the corners.
October 31 - The upstairs is getting finished. Carpet is down. Door hardware is installed. The closet shelf and rod will be installed today.