August 1 - The upstairs wood floor is being installed. The Brays room is off to the left of the hallway.

August 1 - The lounge upstairs now has wide wood flooring installed. Most of the house wood floor is completed.

August 3 - The Brays room has wide pine flooring installed. The house wood flooring is about finished.

August 3 - The master shower is tiled. It will be grouted in the next day or two. The ceiling of the shower remains to be tiled.

August 7 - The wide pine flooring is being face nailed. If you look closely you can see a row of nails along the bottom of the photo.

August 7 - The mud room brick tiles are grouted. They are dirty now, so they don't look as good as they will.

August 9 - The showers in the house are tiled. They still need grout. The heat index has been very high (115) making it difficult to work.

August 7 - The upstairs apartment in the garage has been painted. The floor is installed. Electrical 'trim out' and air conditioning 'turn on' will happen soon.

August 9 - The showers in the house are tiled. They still need grout. The heat index has been very high (115) making it difficult to work.

August 9 - This is another shower. You can see spacers between the tile to hold it in place while the adhesive sets.

August 9 - The paint is finished in the garage upstairs. The electrical trim out will begin soon and then the air conditioner will be turned on.

August 9 - The paint is finished in the garage upstairs. The electrical trim out will begin soon and then the air conditioner will be turned on.

August 14 - The electrical is wired for permanent power. The breaker boxes are completed and closed. Outlets and switches are installed.

August 14 - Air conditioner condensing units will be installed in the next day or two. Notice the meter base and disconnects are installed.

August 20 - Doors are being hung today. This is the garage apartment. The small door is for the pantry just to its right.

August 22 - The garage stairway looks very nice from upstairs. Of course, there will be railings installed soon.

August 22 - The rear deck is being covered with ipe. It will have a 'picture frame' around the outside.

August 22 - The main downstairs air conditioner condensing unit has a pad now. The unit will be installed within the next several days.

August 23 - The ipe deck is being installed. We had a rain last night so the deck has water on it this morning.

August 23 - A refrigerator will go where the green ladder is. The bare walls on the left are in the Brays room. They will have wood on them. The island is in the foreground.

August 23 - The pantry cabinets are being installed. The top cabinets have glass doors and ends (not visible in photo).