February 2 - It's a little hard to tell but the moulding was finished inside of the panelled areas today. The moulding under the stool is also finished.
February 2 - I didn't get a picture before they covered the tops but the Corian tops in the laundry were installed today.
February 3 - The shelves were finished in the owner's entry coat closet today.
February 3 - The doorway to the ante room from the master bath is now all trimmed out. It looks good with the window beyond.
February 3 - The study cabinet was installed today. This cabinet is made completely of cherry and will house a TV and the house stereo.
February 3 - Here is the same cabinet again but without the flash. The cherry really looks nice!
February 4 - Here is a picture in the master bedroom showing the picture mould installed.
February 4 - Here is the picture mould in the south gallery.
February 5 - The trim is nearly finished around the study windows. Just a few more pieces of moulding in the panels and it is done.
February 5 - The condensor units were installed a week or so ago. These are on the north side and are just awaiting electricity to start up.
February 5 - Here is the condensor unit in the south service yard. Soon the electricity will be on and we can condition the inside of the house.
February 5 - Here is the condensor unit in the south service yard. Soon the electricity will be on and we can condition the inside of the house.
February 5 - Here is the condensor unit in the south service yard. Soon the electricity will be on and we can condition the inside of the house.
February 5 - Here is the condensor unit in the south service yard. Soon the electricity will be on and we can condition the inside of the house.
February 9 - This the south service yard with the copper caps installed. The trim around them will be painted to match the rest of the service yard.
February 10 - The exterior metal rails were installed today. These lead from the rear porch to the deck and then to the ground.
February 10 - These are the rails directly outside of the rear entry.
February 9 - This the south service yard with the copper caps installed. The trim around them will be painted to match the rest of the service yard.
February 10 - Here is the owner's entry railing.
February 10 - Here is a view from another angle. This entry looks really good with these rails.
February 10 - The interior doors finally arrived today. They will be installed in the remainder of this week.
February 10 - Here are the rest of the interior doors. These are very nice style & rail doors and will look great when finished.
February 11 - Most of the interior doors were installed today. This is a stainable wood door in the foyer.
February 11 - Here are the double doors into the study. They are also stainable.
February 11 - Here are the double doors for bedroom 2. This and all of the remainder of the doors in the house will be painted.
February 11 - This is a single door going into bathroom 2.
February 12 - The doors in the studio are installed now. They are 4 panels since they are only 6ft-8in tall. They will have trim soon.
February 16 - Here is the finished painted ceiling of the back porch.
February 16 - This is the finished painted ceiling of the screened porch.
February 17 - Here is the finished trim in the hall to the master bedroom showing the pocket door in the closed position.
February 17 - The tile on the master bath tub deck was finished today. It turned out really nice.
February 17 - Here are the finished trimmed doors in the studio. These are shorter doors so they only have 4 panels instead of 5.
February 17 - This is the finished trimmed window above the master bath tub.
February 20 - The great room trusses are being installed. They are made of beams of solid Douglas fir.
February 20 - A stair rail is now on the stairs to Mary's studio. The newel post will have a cap shortly.
February 20 - The upper flight of stairs has a handrail on the wall. Notice the finished floor has not been installed upstairs yet.
February 23 - The great room beam trusses are now installed. This is a view towards the fireplace.
February 23 - Here is a view towards the kitchen. The trusses will have a bracket on the 'X' in the center eventually.
February 25 - Here is another good view of the Douglas Fir trusses in the great room. The steel X brace is on order and will be installed in the center.
February 25 - The floor finishing began today. This is a view of the north gallery and it has now been sanded once.
February 25 - This is a view of the master bedroom. It has also been sanded once and will be resanded again and then stained.
February 25 - Here are the completed master bathroom mirror frames. These will have mirrors inset with lights mounted on them.
February 25 - This is the completed mirror frame in bath 2. The light for this mirror is mounted above.
February 25 - Here is the mirror frame for bath 3. It is identical to the frame in bath 2 and will also have lights mounted above it.