Miller Residence: December 2018

December 4 - A parking pad is in place beside the garage. The temporary LP tank (white) is still back by the corner of the garage.

December 4 - It is busy inside. An electrician (left) is wiring a light switch. Another electrician is working on a can light. The cabinet installer (right) is working on the cabinet installation.

December 4 - The LP tank is in the ground and 'filled' with 400 gallons of propane (tanks can be filled to 80% of their capacity). The technician is plumbing gas to the garage (to the left) and to the main house (lower right corner).

December 6 - Masons are preparing to pour an apron for the garage doors. It will be tabby with a brick border.

December 6 - Shell is being added to the wet concrete in front of the garage doors. It is spread liberally.

December 6 - Once the shell is spread, it is pressed into the surface. Once the concrete sets, it is gently washed removing the top layer of concrete and exposing the shells.

December 12 - Plantation shutters have been installed in the master bedroom. There are three sliding panels.