April 2 - Painting is currently in progress. Everything has been primed now.
April 2 - The second bedroom upstairs has been primed. These wall colors will be painted on eventually.
April 2 - A lot of masking is required in order to paint the newel posts.
April 2 - The great room is masked off and ready for paint.
April 24 - Garage painting has begun. Everything is masked, caulked and puttied and ready for primer.
April 25 - The septic system was started today. Here is the hole for the pump tank.
April 25 - The septic tank is in its hole and waiting to be plumbed in.
April 25 - Backfilling has begun around the house. Several more loads of fill dirt are still needed.
April 25 - The back yard has been cleared out and partially graded. A little more dirt is still needed.
April 25 - The view from the back porch over the marsh. The faint outline of the proposed firepit can be seen on the ground below.
April 25 - The floor finishers are making good progress. The floor stain will be applied tomorrow.
April 6 - After priming the walls get touched-up with putty. These are all either nail holes or imperfections.
April 6 - Cabinet shelving is laid out in the master bedroom and is ready for paint.