March 1 - Handrailing and balusters are in progress on the balcony.
March 2 - Pencil trim has been added around the tile back splashes making for a nice finished look.
March 2 - This is the powder room with the backsplash installed.
March 2 - The tile back splash trim looks nice in the master bath room as well.
March 2 - The fireplace face and mantle are now complete. Just the hearth remains to be finished.
March 2 - Posts are mounted and ready for railings on the stairs.
March 9 - One of the built-in cabinets in the great room is finished. This one will house the TV.
March 9 - Another cabinet is built on the opposite side of the fireplace. This is just shelves.
March 9 - The railing is now complete on the balcony and it looks great!
March 9 - Handrailing is now complete on the stairs.
March 9 - Handrails and balusters are now complete on the stair balcony.
March 9 - The loft handrailing and balusters are finished and look great.
March 23 - Oak credenzas were built and installed on either side of the study entrance.
March 23 - The opposite wall of the study is all bookshelves.
March 28 - Stair treads are installed on the front steps. The bottom 'step' will actually become a boardwalk.
March 28 - The breezeway step treads are now complete. The tabby walkway will come up to the bottom of these steps.
March 28 - The garage is all trimmed out including the stairs. The raised deck will be finished with tile planks.
March 28 - A service yard has been built around the generator and air conditioning units.
March 28 - The missing column has now been added to the corner of the house.