February 2 - The electricians have been working on installing panel boxes for the generator and power meter.
February 2 - The dining area paneling and trim is turning out very nicely. It needs crown and door trim to be complete.
February 2 - A new color sample has been applied in the pantry.
February 2 - The view from the breakfast area into the pocket office. This will be a really nice space when complete.
February 2 - One of the upstairs doors is installed and trimmed out. This one goes to the music closet.
February 2 - Doors to the upstairs guest suites are installed and trimmed and look very nice.
February 2 - The inside view from one of the upstairs bedrooms. Closet is on the left and bathroom is on the right.
February 2 - Color samples are applied to the wall around the trim of this bedroom window.
February 2 - Trim is coming along nicely in the second bedroom suite upstairs.
February 8 - The wood walls are finished on the fireplace face.
February 8 - The wood walls are finished on the fireplace face.
February 14 - This is the doorway to the study. Inset panels were created here as well.
February 14 - Mosaic tiles are installed for the backsplash in the master bath. There will be a tile trim around the top.
February 14 - A bench is built in the master shower. It still needs grouting to fill in the cracks.
February 14 - Newel posts have been installed at the edge of the balcony. The rest of the great room is nearly complete.
February 14 - Counter tops are installed now. Due to the closeness of the window we used quartz for the sill.
February 14 - The counters look great in the pocket office.
February 14 - This is the pantry with its counters and tile backsplash complete.
February 22 - The 'Jib' door to the master dressing room is coming along nicely.
February 22 - The master shower doorway has been trimmed out and looks great.
February 22 - These upper cabinets were installed once the counters were finished.
February 22 - Door and window trim is nearly complete on the back of the great room.
February 22 - Closet systems are being built in the master closet. These are designed and built in-house.
February 22 - This longest wall will have one high-hanging section and two double hanging sections.
February 22 - 'His' side of the closet has two double hanging sections.
February 26 - The kitchen backsplash is complete, grouted, sealed and looks great!
February 26 - The stairs are complete except for the balusters and railings.
February 27 - This is the center island in the master closet. It has shoe cubbies on either side and a bench on the end.