January 2 - Wood was delivered this morning for the walls and ceilings.
January 2 - With it 20 degrees outside we placed two propane heaters to warm the house so tile and wood floors can be installed. Bottles for smaller room heaters are lined up on the wall.
January 4 - This is what the house looks like after 3-4 inches of snow!
January 4 - The snow is pretty but it sure makes for a messy job site when it thaws out.
January 9 - Interior wood ceilings are being installed in the great room.
January 9 - Flooring is installed in the master bedroom and it is being used as a tool room.
January 9 - Tile installation has begun in the master shower.
January 9 - Cabinets are installed in the pocket office and they look quite nice!
January 9 - The first few kitchen base cabinets are now installed.
January 9 - Plank tile flooring has been installed in the mud room and laundry room.
January 9 - The powder bath cabinet is installed as is the oak flooring.
January 9 - White oak flooring is installed upstairs on the loft and in the bedrooms.
January 9 - Tile is installed and ready for grout around the tub upstairs.
January 9 - The cabinet is installed and ready to be templated for counter tops.
January 9 - Flooring and the cabinet is finished in the second bathroom upstairs.
January 10 - More progress has been made on the great room ceiling. This will get a white wash finish.
January 10 - Walls and ceilings are complete in the alcoves beside the fireplace.
January 10 - The decorative tiles are in place and the tile is nearly complete in the master shower.
January 10 - The decorative tiles are in place and the tile is nearly complete in the master shower.
January 17 - The island cabinets are installed in the kitchen.
January 17 - The refrigerator and microwave cabinets are installed.
January 17 - Cabinets are installed in the laundry room.
January 17 - Tile is coming along nicely in the upstairs shower.
January 17 - Some trim is installed around the great room dormers but we don't like it. It will be changed out.
January 19 - The dining room ceiling boards are installed. The face of the beam will receive a paneled detail.
January 19 - The master bedroom ceiling boards are installed. The center beam will be trimmed out soon.
January 19 - These are the dresser and bench seat in the master dressing room. They will get wooden tops.
January 19 - The view into the master closet. A wardrobe cabinet is on the right.
January 19 - The kitchen cabinets are coming along nicely.
January 26 - Trim is installed on the dormer windows and most of the wall paneling is installed.
January 26 - One window is trimmed in the breakfast room. The outlet in the corner has to be moved in order to trim the others.
January 26 - The crown moulding looks really nice in the kitchen and around the range hood cover.
January 26 - The wood wall paneling is a nice touch on the face of the fireplace.
January 26 - The foyer looks nice with the crown moulding installed.
January 26 - There is still a good bit of trim left to do around the dining area. The cabinets were installed so the counters could be templated.
January 31 - The face of the loft is paneled and more wall boards have been installed around the dining area.
January 31 - The trim in the great room is coming together very nicely.
January 31 - The trim in the great room is coming together very nicely.
January 31 - The new and improved crown trim is installed around the dormers in the great room.
January 31 - The dormer in the loft is all finished out with trim now.
January 31 - An upstairs bedroom window with trim installed.
January 31 - This door to the bedroom closet upstairs is all trimmed out now and looks very nice.