07 February 2023 - The trim carpenters are set up and working in the main room. This crew does very good work.
07 February 2023 - The beams are wrapped in wood and the ceiling is blocked and ready for ceiling boards.
07 February 2023 - Exterior walls are being finished on the screened porch.
07 February 2023 - Siding and trim is being installed on the "stables".
14 February 2023 - The tile setter has begun work on the master shower.
14 February 2023 - A number of interior doors are installed.
14 February 2023 - Wood is being installed on the walls.
14 February 2023 - This is the front hallway. The entrance door is straight ahead.
14 February 2023 - In the “stable”, the ramp has been replaced with brick steps.
14 February 2023 - Siding and doors are being installed on the “stable.”
14 February 2023 - Siding and exterior trim are close to finished on the “stable.”
20 February 2023 - More duct work is being installed in the great room of the “stable.”
20 February 2023 - Metal roofing is being installed.
20 February 2023 - These are new panels. Notice the ridge cap has not been installed yet.
20 February 2023 - This tech is cutting the roof panels so they fit nicely into a valley.
20 February 2023 - The main house porch is being trimmed.
20 February 2023 - More interior walls have been covered with wood.
20 February 2023 - The master shower floor has been sloped towards the drain in preparation for tile.