Home
About Us
Services
Testimonials
FAQ
Projects
News
Learning
Contact Us
Employment
Home
About Us
Services
Testimonials
FAQ
Projects
News
Learning
Contact Us
Employment
Pendergast / High Residence: March 2023
Prev: Feb 2023
back
Next: Apr 2023
07 March 2023 - The front porch has a double brick perimeter band that will be grouted soon.
07 March 2023 - Light fixtures are on site, ready to be installed.
07 March 2023 - Appliances are being installed.
07 March 2023 - The brick border on the back porch is finished (and grouted).
07 March 2023 - The counter top has been installed in the master bath.
07 March 2023 - The master closet island also has the counter top installed.
07 March 2023 - The breezeway brick border is laid. It is partially grouted.
14 March 2023 - The rear exterior of the garage and apartment are about finished.
14 March 2023 - This small porch is off the master closet. You can see a small bit of the service yard at the right edge of the photo.
14 March 2023 - The lot slopes so part of the house is a few feet above the ground.
14 March 2023 - Appliances and counter tops have been installed.
14 March 2023 - More cabinets, counter tops and plumbing fixtures have been installed.
14 March 2023 - Light fixtures are being installed.
14 March 2023 - The laundry sink and counter top (and washer and dryer) are installed.
21 March 2023 - Some of the kitchen light fixtures have been installed. Wood shelves will be installed in the slots in the wall.
21 March 2023 - The chandelier is installed and working in the Piano room.
21 March 2023 - The stained beams in the master bedroom look very nice.
21 March 2023 - Stucco has been completed on the foundation around the master porch.
21 March 2023 - Electrical fixtures are installed in the living room.
21 March 2023 - The guest bathtub is finished except for the plumbing and light fixture trims.
21 March 2023 - This guest bath shower is nearly complete. Just needs the stone curb installed.
21 March 2023 - The paint colors look very nice in this guest bedroom.
21 March 2023 - The front porch has fresh stucco around the foundation.
28 March 2023 - The garage doors are now installed and the color is a perfect match to the house.
28 March 2023 - Workers are adding railings and will soon add screening on the back porch.
28 March 2023 - These unique sliding glass doors join in the corner without a post. This gives a nice open space.
28 March 2023 - The walk from the house to the garage looks nice with its finished brick and concrete.