07 February 2023 - The supplier for roofing steel is on site. The roll the steel in the front of the trailer will pass through the rollers (red) and come out shaped for the standing seam roof.
07 February 2023 - Windows and doors are installed. Rough in plumbing is done. The red lines are hot water supply lines; blue, cold water supply lines. The white pipes are drains.
07 February 2023 - The HVAC tech is running ducting in the attic.
07 February 2023 - A small section of siding has been painted for ARB approval.
07 February 2023 - The shop has underlayment on the roof sheathing.
14 February 2023 - Exterior trim is being done. Carpenters are on the roof trimming the dormer windows.
14 February 2023 - The roofing steel has been rolled and is awaiting installation.
14 February 2023 - Lap siding is being installed on the shop. The roof steel is in the left foreground.
14 February 2023 - The shop door is being reframed for a larger door.
14 February 2023 - The HVAC tech has a wire ready for the thermostat.
14 February 2023 - The black circles on the floor of the great room are floor outlets. They will be trimmed to the height of the finished floor if necessary.
14 February 2023 - Both sides of the shop are being sided. Exterior trim on the shop should be finished very soon.
14 February 2023 - Windows in the master bedroom are being trimmed. Once the windows and doors are trimmed, siding will be installed.
14 February 2023 - This is a view from near the master porch (on the right) and the pool (on the left).
20 February 2023 - The guest house has exterior siding and trim.
20 February 2023 - The guest wing of the main house also has been sided and trimmed.
20 February 2023 - The shop door has been reframed. The shop siding and exterior trim are finished.
20 February 2023 - The front of the house is being sided and trimmed.
20 February 2023 - The guest wing of the main house has a mahogany door. The exterior doors are hung.
20 February 2023 - A carpenter is trimming the porch beam on the Master Bedroom porch.
20 February 2023 - The master bedroom wall has been sided and trimmed.
20 February 2023 - This is the guest house from the connecting walk between the main house and the guest wing.