03 January 2023 - This is from the road. Framing of the main house and guest house are moving along well. The shop framing has not been started yet.
03 January 2023 - Windows and doors are on site.
03 January 2023 - The pool rim has been tiled. It will have a deck installed soon.
03 January 2023 - The screened porch off the dining room is being roofed.
03 January 2023 - The roof framing is a bit complex due to the shape of the roof.
03 January 2023 - This is from the walkway between the main house and guest wing. The windows on the left are in the kitchen. The screened porch is at the far end on the left
03 January 2023 - Some of the steel rods used to provide hold down force for hurricanes are installed you can see one just to the right of this window.
03 January 2023 - The guest house framing is well along. This is from the main house – guest wing walkway.
10 January 2023 - The roof is covered with a weatherproof membrane.
10 January 2023 - House wrap is being installed on the guest house.
10 January 2023 - Much of the screen porch roof is in place. This area of ceiling will be octagonal.
10 January 2023 - The view from the master porch is nice.
10 January 2023 - The master bedroom vaulted ceiling is all framed.
10 January 2023 - The kitchen ceiling is also framed.
10 January 2023 - The vaulted ceiling in the great room runs in one direction.
10 January 2023 - Framing has begun on the workshop. It is simple will be completed quickly.
17 January 2023 - The framing is about to conclude. Exterior trim will begin soon.
17 January 2023 - The workshop is framed.
17 January 2023 - The internal bracing has been removed since the sheathing is in place. This is the master bedroom. The two center doors open onto the master porch overlooking the pool.
17 January 2023 - The office is adjacent to the master bedroom. It has a nice view of the pool and the water.
17 January 2023 - The mason is laying firebrick inside the Isokern fire box. The flues are steel.
17 January 2023 - The kitchen (with the higher windows) is framed. It has a vaulted ceiling. The dining room is to the left with the flat ceiling. The exterior wall of the guest wing is visible through the kitchen windows.
24 January 2023 - The buildings now have house wrap. Framing is nearly finished.
24 January 2023 - The ceiling of the screen porch is rather complex.
24 January 2023 - The screen porch chimney also has wrap on it in preparation for stucco.
24 January 2023 - This is a view of the guest wing (on the right) and the guest house in the background.
31 January 2023 - Framing on the shop (left), main house and guest house (right) is about finished.
31 January 2023 - The job sign is on site and ready to be planted.
31 January 2023 - Exterior siding is going on the main house.
31 January 2023 - The far room is the dining room. The kitchen is in the foreground. Past the sliding doors is the screened porch.
31 January 2023 - The great room has a nice view of the water front. The fireplace has been installed and will be trimmed soon.
31 January 2023 - The original, temporary drive is now closed. The landscaper installed some plants in it.