May 15 - Here is the attic on the first day after a few sheets of plywood have been removed.
May 15 - The attic contents have been moved and covered to protect them from dust.
May 16 - The steps have been covered to protect them from traffic.
May 16 - A path was also made to the kitchen where we had to tear into the ceiling.
May 16 - The kitchen is sealed off in preparation for cutting into the ceiling.
May 16 - A protective pad was laid down first and then paper on top of that. This keeps the paper from moving and protects the floor.
May 16 - All of the step treads are protected all the way to the attic.
May 16 - On the second day, more flooring has been removed and the HVAC system is being removed.
May 16 - The HVAC unit is on its new stand and is being put back together.
May 16 - Quite a lot of duct work has been removed. This will be rerouted later.
May 23 - The blocking beneath the walls is mostly complete now.
May 23 - This blocking is per the engineer to help support the walls and keep the I-Joists from buckling.
May 23 - The building inspector came today and approved the blocking so we are ok to cover it with subflooring.
May 23 - Here is where the kitchen ceiling had to be taken out to add in plumbing. The large black pipe is new.
May 23 - Most of the plywood is now down and the wall will likely get started tomorrow.
May 23 - Walls go everywhere there is new plywood.
May 24 - The bathroom walls are now framed up.
May 24 - The sitting room wall is also framed up now.
May 24 - One of the short walls in the bedroom beside the dormer.
May 29 - The tub is now installed as well as the sink and toilet plumbing.
May 29 - The tub is now installed as well as the sink and toilet plumbing.
May 29 - The long wall is mostly built now.