Pendergast / High Residence: December 2022
Prev: Nov 2022
back
Next: Jan 2023
06 December 2022 - The master shower is being prepped for tile.
06 December 2022 - Cabinets are on site.
06 December 2022 - The great room fireplace is trimmed.
06 December 2022 - The linen closet has shelves and is ready for paint.
06 December 2022 - Masons are working on the foundation walls. The piers will have stucco and wood hog fencing will fill the voids.
12 December 2022 - Cabinets are being installed.
12 December 2022 - Here more cabinets are being placed and installed.
12 December 2022 - The master bath shower is being tiled. The red membrane around the window is for waterproofing. It will be covered with tile.
12 December 2022 - A trim carpenter is working in the master closet.
12 December 2022 - Another cabinet installer is working in a bathroom over the garage.
12 December 2022 - Trim work has begun on the garage apartment stairway.
20 December 2022 - Appliances are on site in the garage.
20 December 2022 - Cabinets have been installed. This is one of the baths over the garage.
20 December 2022 - These cabinets are at the head of the stairs over the garage.
20 December 2022 - The master closet built ins are being built.
20 December 2022 - This is another wall of the master closet.
20 December 2022 - The back wall is being build now. Note the island in the center.
20 December 2022 - The cabinet installation is going well.
20 December 2022 - A number of rooms have cabinets.
20 December 2022 - The kitchen cabinets are installed also.
23 December 2022 - The floor is installed in the garage apartment foyer.
23 December 2022 - The same flooring material is installed on the stairs.
23 December 2022 - The stairs need a little more trim work and then the railing added and they will be finished.
23 December 2022 - The stair treads look nice! The raw wood will be painted trim color.
23 December 2022 - The floor of the apartment kitchen area is finished. Baseboard can now be installed.
23 December 2022 - The living area of the apartment looks nice with the flooring all installed.
23 December 2022 - The bar area of the kitchen is installed and ready to have the wall finished and wood shelves installed.
23 December 2022 - This wall of the kitchen will have the over, cooktop and refrigerator installed.
23 December 2022 - The kitchen island will sit in the middle of the room over the two vent holes in the floor.
23 December 2022 - The master shower tile is finished and looks very nice!
23 December 2022 - Tile was also used around the shower window. The window is made of composite materials to prevent water damage.
23 December 2022 - The master closet left side is complete.
23 December 2022 - The back wall of the master closet is complete.
23 December 2022 - Crown moulding runs around the top of the cabinets all around the room.
23 December 2022 - All of the bare wood in the master closet will be painted the trim color.