July 18 - The home is looking good from across the golf course.
July 18 - The front porch has a small dormer on it now. Rough grading has not been done in the yard.
July 18 - The short roof over the garage doors is complete. It needs steel on it. Roofing has been slow with the nearly daily rain.
July 18 - This is how the great room looks from the upstairs hallway.
July 18 - The stucco on the chimney is smooth and painted the roof color.
July 18 - Most of the back of the house has roofing on it. It is also painted.
July 23 - The steel roof is installed except for over the front porch and the auto bay door short roof.
July 23 - The door from the master bedroom to the master bath is being changed to a pocket door.
July 23 - The short roof over the garage auto bay doors is ready for standing seam roofing.
July 24 - Standing seam roof is now on the short roof above the garage auto bay doors. The roofing should be completed by tomorrow.
July 25 - The standing seam roof is now on the front porch. Some of the siding was replaced and will be painted.
July 25 - Dirt under the porches has been smoothed. Porches will be decked soon.
July 25 - The pocket door header (heavy because it supports the beam above it) is in place. The pocket door studs will be installed this afternoon.
July 30 - The sliding doors have been installed. Hardware has been installed on all of the exterior swing doors.
July 30 - Foam insulation has been sprayed in the walls.
July 30 - Fiberglass sound insulation has been put in the walls around the bedrooms and baths.
July 30 - Decking is on the back porch. There is an access hatch on each porch for annual termite inspections and treatment.